Solar power plant developer Oriana Power has received a US$4.2m order to supply a solar power plant to a cement producer in Rajasthan. The supplier says that it will build a 7MW ground-mounted array at the site of cement plant belonging to the producer. The engineering, procurement and construction will take until the end of January 2024.